Shipboard Uncontrolled MIL STD 1399 Part 1 EZ-Test Plan

$695.00

his Electromagnetic Interference Test plan (EMITP) template document set is for MIL-STD-1399 Section 300 Part 1: Low Voltage Electric Power, Alternating Current.  The EMITP is in the MIL-STD-461 format.  It has been configured and customized to meet the requirements set by for equipment designed for use on shipboard uncontrolled systems that utilize 440 Volt or 115 Volt, 60 HZ or 400 Hz electrical power.  This template set contains all required documentation as established in the standard for appropriate Electrical Compatibility testing.

Product Description

EZ-Test Plan MIL-STD-1399 Section 300 Part 1 for Shipboard Uncontrolled Applications

This EZ-Test Plan Test Plan Template is developed for use by manufacturers, contractors, engineering service companies and test labs. This document employs the Electromagnetic Test Plan (EMITP) format specified in DOD MIL-STD-461 per DI-EMCS-801201.  This EZ-Test Plan template (Shipboard Uncontrolled MIL STD 1399 Part 1) is customized for requirements applicable for the testing of shipboard equipment intended for use above decks in an uncontrolled environment.

Test Plans are a requirement for all DOD EMI/EMC and Electrical Compatibility test methodologies.  They serve to inform the laboratory of specific information about the Equipment Under Test (EUT) pertaining to operational modes, frequencies, monitoring, and simulation equipment used, and defined susceptibility evaluation parameters.  This ensures that a proper evaluation will be performed.

Test Plans provide instruction to the test facility for documentation of all test setup and instrumentation parameters so that testing can be replicated at a later date. They also provide the test facility instruction for content of Test Reports as specified in MIL-STD-461 per DI-EMCS-801200.  These test reports provide the required data for post-test analysis and substantiate due diligence for required testing to your customer.

It is essential for product developers of defense materiel to conduct thorough testing at the developmental stage to avoid failures during operational testing that can lead to costly program delays.  An important part in the development of a viable developmental evaluation program is to have well-constructed test plans to ensure that evaluation be conducted that meets requirements for all operational modes of the specific EUT.

EMI/EMC and Electrical Compatibility testing is one of the most challenging hurdles for any product developer especially when that testing is conducted per Department of Defense standards.  Proper test program documentation can provide clarity in the development of evaluative strategies before going to the test facility.

This EZ-Test Plan Template Set (Shipboard Uncontrolled MIL STD 1399 Part 1) includes:

  • Test Plan for one (1) Method with procedure(s)
  • Addendum A – EUT Description, Approved Exceptions, EUT Operation, Test Simulation and Monitoring Equipment, Operating Frequencies, and Performance Check for user customization.
  • Addendum B – Test Lab Description to be filled out by lab as required by MIL-STD-461
  • Test Data Form for Witness
  • Test Label (Photo template) form for pictures at lab by witness

This EZ-Test Plan Template is available or a One-Year License which is renewable for 50% of the standard one license purchase price.

Product Test Experience

Ground Stationary EZ-Test Plans have been developed based on CVG Strategy’s extensive experience in  developmental test and evaluation for defense materiel designers.  This military component testing experience has provided an in depth understanding of MIL-STD-461 test requirements and methodologies.  These insights are reflected in our EZ-Test Plan documents.  Put our experience to work for you by incorporating a precise and clear documentation of EMI/EMC and Electrical Compatibility test and evaluation.  We can also assist with a variety of EMI/EMC Consulting Services.